DECC - Data Sheet Electricity


Excel
March 2014 Total Installed Capacity (MW)
Post-consent Pre-Consent
Technology Operational 2012 
RESTATS Data
Operational Since 
January 2013
   Under Construction   Awaiting Construction   Application being considered 
LPA S36 LPA S36 LPA S36
Biomass 1423.4 1705.1   195.9 68.0 1335.7 1521.0 184.9 120.0
Co-firing 203.5 0.0   0.0 0.0 0.0 0.0 0.0 170.0
RO Hydro 215.3 10.5   9.2 3.0 65.2 5.3 18.5 0.0
Landfill gas 1036.0 0.0   3.1 0.0 11.0 0.0 1.5 0.0
Offshore Round 0 14.0 0.0   0.0 0.0 0.0 0.0 0.0 0.0
Offshore Round 1 1112.4 62.1   0.0 0.0 0.0 0.0 0.0 0.0
Offshore Round 2 1868.8 900.0   0.0 1424.0 0.0 1875.0 0.0 0.0
Demonstration Projects 0.0 12.0   0.0 0.0 0.0 199.9 0.0 0.0
Offshore Round 3 0.0 0.0   0.0 7.0 0.0 1116.0 0.0 6550.0
Offshore Round 1 and 2 extensions 0.0 0.0   0.0 0.0 0.0 389.5 0.0 1000.0
Scottish Territorial Waters 0.0 0.0   0.0 0.0 0.0 750.0 0.0 1500.0
Wind Offshore Total 2995.2 974.1   0.0 1431.0 0.0 4330.4 0.0 9050.0
Wind Onshore 5893.5 1448.4   686.2 810.4 2681.6 2403.2 3292.1 3224.7
Sewage gas 198.7 2.0   4.0 0.0 0.0 0.0 0.0 0.0
Wave and Tide 6.7 0.0   0.0 20.0 61.2 108.4 8.0 277.0
Photovoltaics 1705.5 866.2   551.4 0.0 1508.3 0.0 1340.0 50.0
Large hydro 1470.9 0.0   0.0 0.0 5.0 12.5 0.0 0.0
Waste 592.8 21.5   431.0 70.0 610.9 300.0 153.0 0.0
Geothermal 0.0 0.0   0.0 0.0 5.0 10.0 0.0 0.0
Heat Pumps 0.0 0.0   0.0 0.0 0.0 0.0 0.3 0.0
TOTAL 15741.5 5027.7   1880.8 2402.4 6284.0 8690.9 4998.2 12891.7
 

NOTES

Operational Data
- Operational data are obtained from DECC's RESTATS database, maintained by AEA Technology plc (http://restats.decc.gov.uk).
- The operational data to the end of 2012 are from RESTATS; operational data since January 2013 are derived from the Renewable Energy Planning Database (REPD).
- RESTATS data include all operational schemes, including those resulting from Section 36 consents
- Operational dates were obtained from the DECC database though not all turbine sets may have been operational during the reporting year; there may therefore be differences in operational dates reported by other sources which relate to the site being Fully rather than Partly Operational.

Planning Data
- All other data are obtained from DECC's REPD.
- Currently, the planning data focus on schemes requiring Local Planning Authority Approval (<50MWe Installed Capacity) however S36 schemes are included.
- The REPD data contain one Hot Dry Rocks scheme that is not listed in the above table.